Excavation Calculator

Work out the m² and m³ of every dig, the tonnes and loads to cart away, the sub-base, sand and concrete to go back in, and what the job costs to price.

Job Optional, for the printout

Who the estimate is from and who it's for. Everything is saved in this browser, and your business details are kept for the next job.

Your Business

The Customer

Printed on the estimate, e.g. what's included, access or what the customer needs to clear

Printed as a "valid until" date. Leave blank to leave it off.

Billing a VAT-registered contractor? The reverse charge may apply.

Ground and Muck-Away Defaults filled in

Soil swells once it's dug, so the lorry or dumper carries more than the hole held. Pick the ground and where the spoil goes; every figure can be changed to match yours.

£

A load is full at its volume or its weight, whichever comes first. Heavy clay in a skip usually hits the weight limit long before it reaches the top.

Digs

No digs added yet

Click "Add Dig" for each area, trench or pit on the job

Material Prices Optional

Your supplier's prices for what goes back in. Leave a price blank to work out the quantity without costing it.

£
£
£
£
£
£
£
£
£

Added to every material ordered for spillage, uneven formation and compaction. 10% suits most jobs; allow more for concrete into soft or uneven ground.

Extras Optional

Anything else the job needs, such as a short-load charge on a small ready-mix order, a skip permit, extra tip fees or a CAT scan. Each one goes into the total and takes the markup. Tick "Show on Estimate" to name it in what the customer's price includes.

Machine and Labour Optional

The days on site come from how much the machine digs and loads in a day, rounded up to the half day, plus any days for laying and finishing.

Of its output, as trenches dig slower

Of its output, as pits dig slower

£

Laying, compacting, setting up

£

On materials, muck-away and extras

Estimate

Add a dig to see the estimate.

Disclaimer: These are estimates only, worked out from the measurements, figures and prices you enter. Soil weights, bulking, load and dumper sizes and digger outputs start at typical figures, but real ground and plant vary: wet clay is heavier, rock and roots slow the dig, a soft formation can need digging deeper, and hauliers and skip firms set their own weight limits. Quantities include your wastage allowance but not over-dig, battered sides or soft spots. Always locate underground services before you dig, check every measurement on site, and confirm load sizes, weight limits and prices with your haulier, plant hire firm and supplier before quoting or ordering. The customer estimate goes out in your name, so check it before you send it. ProWorks gives no warranty as to accuracy or fitness for purpose and accepts no liability for any loss arising from use of these results.

Pricing a Dig

The things that turn a tidy price into a loss once the bucket goes in.

Price the Loose Volume

A cubic metre in the ground comes out as 1.1 to 1.5 m³ in the wagon. Price the muck-away on the bulked figure, not the size of the hole.

Watch the Weight

Clay weighs close to 2 tonnes a cubic metre. A skip or grab lorry can be at its legal weight with room to spare, so the calculator counts loads by whichever limit is hit first.

Measure the Depth Twice

On a sloping site take the depth at both ends; the calculator averages them. Dig to the finished level less the build-up: a 50 mm block on 50 mm sand and 150 mm Type 1 needs a 250 mm dig.

Find the Services First

Get the utility plans, scan the area with a CAT and Genny and hand dig trial holes near anything you find. Allow time for it in the price.

Pricing the rest of the job? Work out your charge-out rate or the markup on materials.

In ProWorks, the job is quoted from your saved rates, and the materials and hours are tracked against the price as the work goes on.

Turn Measure-Ups into Quotes with ProWorks